亚洲国产中文精品高清一线久久_美日韩va精品一区二区三区_国产精品一二三四电影在线观看_国产欧美日韩乱码一区二区_色YEYE网址在线观看_强奸乱伦制服丝袜_久久在线观看日本高清_欧美精品国产日产精品_免费看污污的软件_中文字幕视频专区

  • Welcome to visit zhong wei
  • Green and environmental protection
  • Products have anti-static floor
  • Aluminum ceiling, color plate, grille lamp

news

position:主頁 > ENGLISH > Technical Support > news >
knowledge news

Flooring should be installed before or after the

來源:中為 瀏覽次數(shù):

0

When first gate or the questions the first floor debate for a long time, small think best is to install the back door. Several claims for everyone as a reference: 
1. gate precisely to ensure that after the first floor doors and gaps between the floor size. If gate flooring will have one question, is the gap between the door and floor remain larger than small, unsuitable to do? Although for skilled of installation workers can first through advance told floor of thickness to reserved scale, but any engineering are is has errors has variables of (to flat errors led floor errors, and door errors), door big has will ugly and noise role also poor, door small has, a has can door and floor will conflict, II has can due to future wood floor bulge Alice song or door slightly sinking on mutual conflict. 
2. loading the back gate to avoid loading door and flooring often floor between the door frame and a variety of special angle and scale installation difficulties, avoiding the cartridge door floor floors combined with difficulties between the frames. 
3. first ensures the door frame on the floor after floor, door frames and floor gap between glass glue will form on elastic contact, ensure that moisture does not enter from the fracture surfaces of the door frame to door deformation. 
of course, if the gate after the first floor will also have several questions: 
1. relatively heavy, are able to hit the floor, walked up and down and workers are able to scratch the floor. 
2. gate with a certain amount of glue and wood ashes, soiled floor. 
3. no gate, skirting the floor well shut. 
but this is not a large problem, solution is as follows: 
1. mounted around the front door with cardboard and other information covering the floor protected. 
2. can require workers to corridor or terrace, cleaned local cutting saws information, to avoid dust. 
3. baseboard will not load, loading door again to put door or the door a kick line to leave a little length, do not nail, after installing your door gate workers according to the actual situation of the kick line cut and fitted.

更多產(chǎn)品歡迎咨詢:

TEL:186-9225-1673

公司電話:0731-88731697

公司網(wǎng)址:www.zwxcl.com

上一篇:Also need to fill water and lock the floor water 下一篇:沒有了
相關(guān)產(chǎn)品
HOME  | About  | Products  | Technical Support  | CASE  | Contact

address:6th floor, building 1, xincheng science park, 588 yuelu west avenue, changsha high-tech development zone

TEL:0731-88731697 phone:186-9225-1673

Record number:湘ICP備15012871號(hào)-1

Message Board

>在線客服
QQ咨詢
客服電話

0731-88731697

陳經(jīng)理

微信公眾賬號(hào)